Anglicare Aged Care Complex: 1200A Main Switchboard Replacement with Zero Downtime
Published 06/03/2025
When it comes to aged care facilities, maintaining uninterrupted power is non-negotiable. At GBE Group, we understand the importance of reliable electrical systems, which is why we were entrusted with replacing the 1200A Main Switchboard at the Anglicare Aged Care Complex—without causing disruptions to residents or staff.
[Project Overview]
Anglicare required a 1200A Main Switchboard (MSB) replacement to modernise their electrical infrastructure. However, as an aged care facility, power continuity was critical—residents and staff rely on a stable electrical supply for daily operations, medical equipment, and essential services.
[Our Solution: No Downtime with Backup Power]
To ensure a zero-downtime transition, GBE Group installed a temporary backup generator (GENSET) before removing the old switchboard. This allowed our team to safely complete the replacement without any disruptions to the site. Our experienced electricians executed the upgrade efficiently, ensuring the new MSB met all safety and compliance standards while improving system reliability.
[Why Main Switchboard Upgrades Matter]
Aging switchboards can lead to power instability, increased fire risks, and system failures. Upgrading to a modern switchboard not only improves energy efficiency but also enhances the facility’s ability to handle future electrical demands.
[GBE Group: Your Trusted Partner for Electrical Upgrades]
From healthcare and aged care to commercial and industrial facilities, GBE Group delivers tailored electrical solutions with minimal disruption. Whether it’s a main switchboard upgrade, emergency power solutions, or compliance-driven electrical installations, we provide reliable and cost-effective services.
📞 Need a power upgrade without downtime? . Contact us today!
